top of page
section zooms.jpg
1/4
© Roy Albag Architecture LTD
Inauguration of the Second Temple, orientation and sunrise
Project objectives
2D print
3D reconstruction and light Analysis
The initial step of the sunrise study dedicated to the creation of an accurate georeferenced 3D model of the Second Temple in Jerusalem reconstruction of the courtyard, altar, the Nicanor Gate, and surrounding walls. The reconstruction built according to the specifications, which appear in the Mishnah (Tractate Middot) set along a 99.7˚axis as suggested previously by Patrich. In addition, the exact elevation of the temple mount and surrounding topography, including the Mount of Olives, that modeled into the model.
(2019-2020)
bottom of page